Drainage Upgrade Project

The Regional District of Okanagan-Similkameen has hired OK Excavating to build and install drainage collection and diversion works at the Campbell Mountain Landfill. The works were designed and will be overseen by Sperling Hansen and Associates.

The physical works will include installation of various pipes to collect and transport water away from buried refuse and the City of Penticton compost facility. A lined collection pond will also be constructed to store excess water. The collection pond will be used to collect drainage water as well as leachate. The leachate collection system will be built separately to this project.

There is no intended disruption of Spiller Rd during construction. Construction will be below Spiller Rd. If there are any impacts to Spiller Rd then local residents will be informed.

Questions regarding this project can be directed to info@rdos.bc.ca or the Regional District office at 250-492-0237.